Testing and approval or rejection of components (21 CFR 211.84)

What this CGMP section requires, what FDA investigators cite under it, and how to build a corrective action plan that holds up, in plain language.

What 21 CFR 211.84 requires

  • Each lot of components, drug product containers and closures is held (quarantined) until it is sampled, tested or examined and released by the quality unit.
  • At least one test must confirm the identity of each component. Other attributes can rely on a supplier's certificate of analysis only if the supplier's results are shown to be reliable, with the firm's own testing at appropriate intervals.
  • Components liable to microbiological contamination must be tested as appropriate before use.

Read the official text on eCFR (21 CFR 211.84).

What gets cited under 211.84

Patterns that commonly appear in Form 483 observations and warning letters citing this section:

  • Components were used on the strength of a certificate of analysis with no identity test.
  • Supplier certificates were trusted without ever verifying their results.
  • High-risk components (such as glycerin and other materials at risk of DEG/EG contamination) were not tested as FDA guidance expects.
  • Materials moved to production before quality released them.

Questions to ask before an investigator does

  • For each component, which test proves identity, and where is the result?
  • When did you last verify each supplier's certificate with your own full test?
  • Are high-risk components tested for the contaminants FDA has flagged?

Common root causes

  • Supplier qualification is a paperwork exercise.
  • Warehouse system allows use before quality release.
  • No risk ranking of components.

What a solid corrective and preventive action plan includes

  1. Add an identity test for every component lot.
  2. Set a supplier certificate verification schedule based on risk.
  3. Test high-risk components to FDA's current expectations.
  4. Configure the warehouse system so unreleased lots cannot be issued.
  5. Check effectiveness by auditing 20 recent receipts end to end.

If your 483 cites 211.84

A written response within 15 business days of the inspection close-out is voluntary, but FDA considers responses received in that window before deciding on further action, such as a warning letter. Address each observation: what you found, the root cause, the correction, the preventive action, the evidence, and dates. Avoid blaming individuals without asking why the system allowed the error.

Paste your observations into the free Form 483 triage tool to get each one mapped to FDA's inspection systems with a response calendar, or see how Claraxis helps with 483 responses.