---
title: Sample report: Manufacturing Operations Score | Claraxis Group
url: https://claraxisgroup.com/assessment/sample/
description: An illustrative CxAM™ result: maturity levels, lowest-scoring areas and a starting plan for a contract manufacturer.
source: Claraxis Group LLC
---

[CLARAXIS](https://claraxisgroup.com/)

YOUR MANUFACTURING OPERATIONS SCORE · CxAM™ v1.0 · EVIDENCE GRADE S · SAMPLE

# Quality is your strongest area. Reliability is your lowest — and it typically limits what happens downstream.

Self-assessment based on your 12 answers · not an audit · illustrative data

OVERALL MATURITY

3.1

/ 5

Level 3 · Standardized

Reactive Stabilizing Standardized Proactive Predictive

Standard work exists and is mostly followed. Problems are solved, but often after they reach the customer or the batch record.

BY DISCIPLINE

Peer benchmarks added once enough plants opt in

Leadership

3.6 · Proactive
Reliability

2.2 · Stabilizing
Flow

3.0 · Standardized
Quality

3.8 · Proactive
Data / AI

2.8 · Stabilizing

Reliability at Level 2 means PM exists but slips under schedule pressure. Level 3 looks like: PM windows protected in the weekly plan, and downtime reasons captured on every stop. [See all level definitions](https://claraxisgroup.com/assessment/method/)

## Your three lowest-scoring areas

1 · RELIABILITY

### PM is calendar-based and slips under schedule pressure

Typically affects: OEE, unplanned downtime, schedule adherence

Value lever: reduce cost

2 · RELIABILITY → FLOW

### Changeovers run long and vary by crew

Typically affects: changeover time, batch size, inventory turns

Value lever: improve cash flow

3 · DATA / AI

### Downtime reasons aren't captured consistently

Typically affects: root-cause accuracy, MTTR, data quality score

Value lever: sustain value

Upstream flag: your answers on schedule changes suggest part of the Flow gap may start in Planning, not on the floor.

## Your starting plan

Built from your answers, not a site visit. Treat it as a hypothesis and check it against your own downtime, yield and schedule data before committing resources.

Days 1–30

STABILIZE

- Lock PM windows into the weekly schedule

- Standard downtime reason codes on the top-3 lines

- Daily tier-1 review of losses > 30 min

Watch: PM compliance ↑

Days 31–60

REDUCE LOSS

- SMED on the longest changeover

- Root-cause the top 3 downtime reasons

- Critical spares review

Watch: changeover time ↓ · OEE ↑

Days 61–90

SUSTAIN

- Shift PM toward condition-based on 1 asset class

- OEE dashboard reviewed in daily cadence

- Re-score to confirm the level change

Watch: schedule adherence ↑

YOUR EVIDENCE GRADE

## This result is grade S. Here's how to make it stronger.

S

### Self-reported · you are here

Your 12 answers, scored against CxAM™ definitions. Good for direction, not for decisions on spend.

V

### Verified on the floor

A Claraxis operator walks your lines with your team and confirms or adjusts each level.

[Start with a 30-minute call →](https://claraxisgroup.com/start/)

M

### Measured from your data

Levels confirmed against your OEE, yield and schedule data, and tracked as you improve.

YOUR DATA STAYS YOURS

## Find your headroom without handing anyone your gaps.

Scored in your browser

Your answers never leave your computer, and no account is needed.

We see nothing unless you send it

Claraxis receives your answers only if you request the PDF report or contact us.

You own your result

Keep it, share it inside your company, or delete it. It's yours either way.

Metrics, not documents

For an evidence check, you can share figures you worked out yourself instead of records.

Anonymous benchmarks, by choice

Opt in to share anonymously and get peer comparisons back. Groups under 30 plants are never shown.

Under NDA before any site work

Floor walks and data reviews start with an NDA and a data agreement. We never share your data or use it to train AI models.

Regulated plant? Ask your counsel where results should be kept. [See the recordkeeping note](https://claraxisgroup.com/assessment/method/#records).

## This is a sample. Get your own in five minutes.

Scored privately in your browser, with no sign-up.

[Take the assessment](https://claraxisgroup.com/assessment/start/)

Want a second opinion on the plan? A 30-minute call walks through your result with an operator.

[Book a call](https://claraxisgroup.com/start/)

[CLARAXIS](https://claraxisgroup.com/)
Operations and digital growth for manufacturers and consumer brands. One partner, from first batch to first buyer.

[Book a 30-minute call](https://cal.com/claraxisgroup/30min)

Operations

- [FDA inspection readiness](https://claraxisgroup.com/fda-inspection-readiness-consultant/)

- [Form 483 response](https://claraxisgroup.com/fda-483-response-help/)

- [Purified water](https://claraxisgroup.com/usp-purified-water-consultant/)

- [Product launch](https://claraxisgroup.com/product-launch-commercialization/)

- [Fractional COO](https://claraxisgroup.com/fractional-coo-consumer-products/)

Digital growth

- [Website & search](https://claraxisgroup.com/digital-growth/#search)

- [Leads & dashboards](https://claraxisgroup.com/digital-growth/#leads)

- [Google Ads](https://claraxisgroup.com/digital-growth/#ads)

- [Social & commerce](https://claraxisgroup.com/digital-growth/#social)

- [Free AI-Visibility check](https://claraxisgroup.com/ai-visibility-audit/)

- [Coughlan case study](https://claraxisgroup.com/coughlan/)

Company

- [About](https://claraxisgroup.com/about/)

- [Who we serve](https://claraxisgroup.com/who-we-serve/)

- [Insights](https://claraxisgroup.com/insights/)

- [FDA Watch](https://claraxisgroup.com/fda-watch/)

- [Water Historian](https://claraxisgroup.com/water-historian/)

- [Partner or join us](https://claraxisgroup.com/#grow)

© 2026 Claraxis Group LLC · Morristown, NJ · [info@claraxisgroup.com](mailto:info@claraxisgroup.com) [LinkedIn](https://www.linkedin.com/company/claraxisgroup) · [Privacy](https://claraxisgroup.com/privacy/)
